Customization: | Available |
---|---|
Type: | Plastic Mould Parts |
Material: | Copper |
Still deciding? Get samples of US$ 0.1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item Name | Wmould Quick Release connector plugs ZZ805 for injection mould |
Used | Plastic Mould |
Tolerance | As per standard or drawing |
Heat treatment | High Frequency |
Surface treatment | As per standard |
Shipment | By air (DHL,UPS,TNT,FEDEX) or By sea |
Packaging | Inner: Platic bag; Outter: Carton box |
After-sale service |
1. Remake goods freely & soonest if there is quality problem |
2. Accept cancelling order when there is big quality issue | |
Our advantage | 1. Made to order & samples are available |
2. Best quality material & accurate sizes | |
3. Skilled engineers & advanced technology | |
4. Precise inspection | |
5. Ontime delivery | |
How to order | 1. Send us drawing or standard code & size |
2. We quote you within 1 day | |
3. Get agreement with price and sign PO or Contract | |
4. Make payment in advance | |
5. If sample required, we will make sample firstly |
Company Information
Certifications
Package&shipping
FAQ
1. Are you a manufacturer or a trading company?
We are direct manufacturer with over 18 years' export experience for precision parts, welcome to visit us.
2. How can I get the quotation?
Please contact our sales man with your demands,information include material,model number and any other special requirements.
3. Can you produce precise parts according to our drawing or our samples?
Yes, we can produce parts according to your 2D or 3D drawings, and we can make measurement for your samples to make drawings for production.
4 . What is the quality guarantee?
We will make 100% inspection before packing and delivery to make sure the products 100% meet your requirements.
We will keep the production drawing and test report with 3 months, if you found any problems when received the parts, please contact us at the first time, we will give you a solution within 8 hours.
5. How do you guarantee the deliver time?
We have independent PMC department to arrange the production plan.
We have production meeting every morning to report the production progress and discuss the problems.
We will make production progress report to you every week and take some pictures for your reference, that's you can know our production progress clearly.